Introduction
- If a thing is clearly denied in IMMM, even if GeM gives the option, IMMM is to be followed. However, if GeM is saying that this provision is to be followed and IMMM provision being old is not changed, the GeM provision is to be followed.
- For all post contract issues CPA will be as per BDP 2015. Further sanctioning authority will be as per BDP and Indentor need not get approval of L1 for Sanctioning.
- However, whether the item is Vital/Essential/Desirable, still requires approval of L1/ Director as per limits mentioned in Circular No 27/2020.
-
Specifications
- Most probably Golden parameters will go. Buyer can put any value against the parameters available. However it will take some time.
- Sanction Order created through GeM is visible to vendor.
-
Bid Creation
- For cases above 10 Lakh, experience criteria should be there.
- For Inspection, choose "Board of Officers" and then under Additional Terms and Conditions, choose QAD/Indentor and Location (Like Sivasagar etc.)
-
Bid Evaluation
-
A bidder is MSE and the same is certified by GeM. However, exemption of EMD and price preference is only given to those MSEs who have quoted as manufacturer and not trader.
-
-
Clarifications
- Til the time IMMM alllows, clarifications cannot be asked at this stage.
- Purchase Order
- GeM PO is not required to be signed. Only it is to be created and released at 01 and CH level. Further for all other things, the Terms and Conditions mentioned in GeM Contract (Which is to be uploaded in Documents) are to be taken care.
-
New Coming Features
- Caution money is being introduced for vendor. This may improve delivery of order.
My Public Blog
GeM |
|
Disha ManualDISHA Manual
NotesheetsAll tables should be Auto Fit to Windows. They will look beautiful. |
|
IMMM Clarifications (Part 01)
|
|
10 Tender Committee10.1.1 For GeM cases, TC is not required. However, my understanding is that for high value cases, TC should be held. Further, negotiation can only be recommened by Tender Committee irrespective of the value of the case. In many amendments and circularshether negotitiation is to be done, allcs.
10.2.2 Tender Committee through Microsoft Meet/ Sametime is acceptable.
|
|
13 Tender Evaluation13 Tender Evaluation 13.3 Comparative statement 13.3.2 All the bids received in respect of an enquiry or advertisement should be
13.3.8 The comparative statement will be checked and signed by the officer of 13.4.3 However, in case after opening of un-priced techno-commercial bids, if it is
(iv) Situation: The bidder has taken clear deviation to any of the
situations where second round of clarifications are unavoidable, approval of
13.4.10 When clarifications are sought from a bidder, documents which have been “This is to confirm that we ….. (name of the bidder) have attended the post bid 13.6.1 Tenders should be finalized within the stipulated original validity of the bids |
|
24.3 Post Contract Issues4.3 Post contract issues |
|
01 IntroductionInspection does not come under post contract issue. |
|
Indent ChecklistFollowing things are to be checked in Indent:
|
|
Reasonability of Rates
|
|
CategorisationCategorisarion is not available in IMMM. Further only Vital cases are to be progesed. Level of TC is not to be changed. |
|
GeMGeM ManualIndentGolden Parameters The indentor has to provide all parameters including golden and silver. If against any parameter, any value is acceptable, the same should also be indicated. Bid Allowed Values are to be carefully checked. They are very much important. If an item is available in GeM, the same must be procured through GeM only. For this the specifications of the items are to be divided into two categories (1) Golden Parameters (2) Silver Parameters. If the golden parameters are available and silver parameters are not available, the item have to be assumed to be available in GeM. Further, GeM has the criteria of best matching. Once the golden parameters are chosen, the sort value has to be "Best Match" and then first item is to be taken as sample bid creation. If an item is available but vendor is not available, the item is to be purchased through GeM only. Bid CreationWhen a Bid is created, the item with right prices (if possible choose OEM). because it is seen that many vendors quote very low prices and Bid Price can never be more than Bid Value. Vendor is to be onboarded. Now GPA is compulsory. GeM is compulsory. EMD is to be applied as per GeM and not as per IMMM Although IMMM says that SD is not to be asked for cases below Rs 30 Lakhs, the provision was framed when the SD value was Rs. 30 Lakhs. SInce GeM has changed the same and now asked for SD for cases above Rs 5 Lakhs, the same may be followed. |
|
PO Indigenous CreationFollowing PO Texts are to be put PO Texts Below Rs 10 LakhsTerms and Conditions1. WARRANTIES AND GUARANTEES 1.1 MATERIALS AND WORKMANSHIP Supplier shall fully warrant that the stores, equipment and component supplied under the order shall be new and of first quality according to the specifications and shall be free from defects (even concealed fault, deficiency in design, Materials and Workmanship). In case of supply of finished product/ item/ equipment/ material, the finished product/ item/ equipment/ material shall in no case be of a date of manufacture older than one year from the date of its shipment/despatch. 1.2 Should any defects be noticed in design, material and/or workmanship within 12 months after the goods or any portion thereof as the case may be have been delivered (and commissioned) to the final destination indicated in the contract or for 18 months after the date of dispatch whichever period conclude earlier unless specified otherwise in the condition of contract. ONGC shall inform supplier and supplier shall immediately on receipt of such intimation, depute their personnel within 14 days to investigate the causes of defects and arrange rectification/replacement/modification of the defective equipment at site, without any cost to ONGC within a reasonable period. If the supplier fails to take proper corrective action to repair/replace defects satisfactorily within a reasonable period, ONGC shall be free to take such corrective action as may be deemed necessary at supplier’s risk and cost after giving notice to the supplier. 1.3 Damage to the machinery and/or replacement due to incomplete and erroneous instructions issued by supplier will be the responsibility of the supplier and will be treated according to the provisions of warranty clause. Normal wear and tear shall not come under purview of this clause. 1.4 In case defects are of such nature that equipment shall have to be taken to supplier’s work for rectification etc. supplier shall take the equipment at his cost after giving necessary undertaking or security as may be required by ONGC. ONGC shall if so required by the supplier, dispatch the equipment by quickest mode on freight to pay basis to the supplier’s work. After supplier shall deliver the equipment at site on freight pre-paid basis. All risks in transit to and fro shall be borne by the supplier. 1.5 Equipment or spare parts thereof replaced shall have further warranty for a period of 12 months from the date of acceptance. 1.6 If the repairs, replacement or modifications referred are of such nature as may affect the efficiency of the equipment ONGC shall have the right to give to the supplier within one month of such replacement/renewal, notice in writing to carry out test as may be required for acceptance of the equipment. 1.7 If the supplier fails to meet his obligation to repair or replace defective goods within a reasonable period of time, if supplier refuses to carry out work under the guarantee clause and implied guarantee conditions, if danger is anticipated or in case of severe urgency, ONGC shall be entitled to carry out at supplier’s cost and risk repair work or replacement deliveries or have it done by a third party. In case not all goods have been delivered by a supplier, ONGC is entitled to procure the remaining goods at supplier’s cost and risk. This does not relieve supplier of any of his guarantee obligations. Taxes and duties of any kind whatever imposed by the authorities of the country of the supplier or his sub-contractors until delivery, shall be borne by supplier. 2. REJECTION 2.1 If ONGC finds that the goods supplied are not in accordance with the specifications and other conditions stated in the order or its sample are received in damaged condition (of which matter ONGC will be the sole judge), ONGC shall be entitled to reject the whole of the goods or the part as the case may be and intimate to the supplier the rejection without prejudice to the ONGC other rights and remedies to recover from the supplier any loss which ONGC may be put to, also reserving its right to forfeit the security deposit/performance bond if any made for the due fulfillment of the contract. The goods shall be removed by the supplier and if not removed within 14 days of the date of communica¬tion of the rejection ONGC will be entitled to dispose off the same on account and at the risk of the supplier and after recovering the storage charges at the rate of 5% of the value of goods for each month or part of a month and the loss and expenses if any caused to the ONGC, pay balance to the supplier. 3. REPLACEMENT 3.1 Rejected goods should be removed and replaced within 14 days of the date of communication of rejection. 4. SUB-LETTING AND ASSIGNMENT: 4.1 The contractor shall not save with the previous consent in writing of the Purchase Authority, sublet, transfer or assign the contract or any part thereof or interest therein or benefit or advantage thereof in any manner whatsoever. Provided nevertheless that any such consent shall not re¬lieve the contractor from any obligation, duty or respon¬sibility under the contract. 5. BREAKAGE/SHORTAGE 5.1 Claim in respect of breakage/shortages in any case shall be preferred on the supplier within thirty days from the date of receipt of stores by the consignee which shall be replaced/made good by the supplier at his own cost. All risk of loss or damage to the material shall be upon the supplier till it is delivered to the purchaser/consignee. 6. FAILURE AND TERMINATION CLAUSE/ LIQUIDATED DAMAGES CLAUSE: 6.1 Time and date of delivery shall be the essence of the contract. If the contractor / supplier fails to deliver the stores, or any installment thereof within the period fixed for such delivery in the schedule or at any time repudiates the contract before the expiry of such period, the purchaser may, without prejudice to any other right or remedy, available to him to recover damages for breach of the contract. a) Recover from the contractor/Supplier as agreed liquidated damages and not by way of penalty, a sum equivalent to ½% (half percent) of the contract/ supply order price of the whole unit per week for such delay or part thereof (this is an agreed, genuine pre-estimate of damages duly agreed by the parties) which the contractor has failed to deliver within the period fixed for delivery in the schedule, where delivery thereof is accepted after expiry of the aforesaid period. It may be noted that such recovery of liquidated damages may be upto a ceiling of 10% of the contract/ supply order price of the whole unit of stores which the contractor/ supplier has failed to deliver within the period fixed for delivery , or b) Cancel the contract/supply order or a portion thereof by serving prior notice to the contractor/supplier. c) It may further be noted that clause(a) above provides for recovery of liquidated damages on the cost of contract/supply order price of delayed supplies (whole unit) at the rate of 1/2% (half per cent) of the contract/supply order price of the whole unit per week for such delay or part thereof upto a ceiling of 10% of the contract/supply order price of delayed supplies (whole unit). Liquidated damages for delay in supplies thus accrued will be recovered by the paying authorities of the purchaser specified in the supply order, from the bill for payment of the cost of the materials submitted by the contractor/supplier or his foreign principals in accordance with the terms of supply order/contract or otherwise. d) Notwithstanding anything stated above, equipment and materials will be deemed to have been delivered only when all its components and parts are also delivered. If certain components are not delivered in time the equipment and material will be considered as delayed until such time all the missing parts are also delivered. e) The applicable GST on the LD shall have to be borne by the contractor. Accordingly, the liquidated damages shall be recovered from the contractor along with applicable GST 6.2 LEVY OF LIQUIDATED DAMAGES (LD) DUE TO DELAY IN SUPPLIES: LD will be imposed on the total value of the order unless 75% of the value ordered is supplied within the stipulated delivery period. Where 75% of the value ordered has been supplied within stipulated delivery period, LD will be imposed on the order value of delayed supply(ies). However, where in judgement of ONGC, the supply of partial quantity does not fulfill the operating need, LD will be imposed on full value of the supply order. Header NoteNA Additional Quote Reference and Date:1. Tender No L41ML19001 2. Your offer ref. No. 650113539 in e-tender and subsequent communications against tender no. L24VL19003 opened on 27.11.2019. 2. NOA No.: JOR/AAB/SUPPORT/MM/PURCHASE/2019/502887 dated: 10.01.2020. DeadlinesNA Terms of DeliveryFOR-Destination, i.e. ONGC, Central Stores, Cinnamara, Jorhat-785704. INSURANCE AND SHIPPING CLAUSE:To be framed TERMS OF PAYMENT100% Payment will be made against receipt of materials in good condition with satisfactory inspection report and guarantee/ warrantee certificate through NEFT within 21 days from the date of submission of clear (undisputed) bills/invoices complete in all respects. The original invoice should accompany the following documents/details: i. Copy of valid registration certificate under the GST legislations. ii. Particulars required for making payments through ‘Electronic Payment Mechanism’. iii. Mobile No. (Optional). iv. Tax Invoice (Original and duplicate) issued under relevant GST legislations/rules indicating rates and amount of various taxes/ duties shown separately, etc). v. Proof of delivery in case of direct / door delivery (i.e. GCN/LR/Delivery Challan, duly acknowledged by the consignee, for receipt of material in good condition) vi. QCC Report for satisfactory inspection(wherever pre-despatch inspection is applicable). vii. Warranty/ Guarantee Certificate. viii. Any other document specifically mentioned in the Purchase Order, or supporting documents in respect of other claims (if any), permissible under the Purchase Order. ix. e-mail ID.
WarrantiesNA Penalty for Breach of ContractNA Security Deposit/PBGNA Contract Riders (Clauses)NA
PLACE OF INSPECTIONInspection will be done at firm’s warehouse i.e. Draeger Safety India Pvt. Ltd., Factory Shed No.6, Survey No.42, Village, Deodal, PO Kaman, Taluka-Vasai, District- Thane 401202 by I/c-QAD, ONGC, Mumbai or his authorized representative. Text for Date of Delivery90 days from the date of confirmed irrevocable Letter of Credit. BILLS SHOULD BE IN THE NAME OF (Paying Authority)The bills / invoices in the name of In-charge Finance, A&AA Basin, Jorhat to be submitted to Invoice Receipt Desk , Dhanshiri Bhavan, ONGC, Cinnamara, Jorhat 785704 in a sealed envelope after 14.00 hrs. (during working hours) on any working day. The envelope containing the invoice should be super scribed with the following details: (i) Vendor No. (ii) PO No. (iii) Invoice No(s). (iv) Invoice date. (v) E-mail ID where tracking no will be sent. (vi) Invoice value and currency. Name of Work/ MaterialProcurement of Jacket Cooling Water Pump Assembly & Associated Spares for Waukesha Gas Engine Distribution of PO:1. Indentor: DGM(P)-I/c HSE (Asset), ONGC, Jorhat - with a request to obtain essentiality certificate as the items to be procured are for use in petroleum operations. Indentor is also requested to check the PO and in case of any discrepancy, the same may be conveyed within 7 days. 2. Consignee: CM (MM)-I/C-Warehouse, ONGC, Central Stores, Cinnamara, Jorhat-785704 3. Paying Authority: Sr. F&A.O.- Bills, ONGC, Dhansiri Bhavan, Cinnamara, Jorhat-785704 4. Inspection Authority: I/c-QAD, ONGC, Mumbai. 5. Office copy. Special Price Instructions:The Gross price for each items mentioned above are inclusive of Freight Charges and Insurance Charges. However, the grand total price includes of freight, insurance and GST@5% against submission of Essentiality Certificate (EC) issued by DGH. Supplier to provide the requisite documents (i.e. copy of Proforma invoice with GST @5% and packing list) for applying EC with DGH at least 30 days before scheduled dispatch of material for enabling ONGC to avail the concessional rate of GST @5% against submission of EC.
Material shall be dispatched only after receipt of EC.
Note: Break-up of the prices of each item is attached separately as Annexure-V. LD Instructions:1. Indentor: DGM(P)-I/c HSE (Asset), ONGC, Jorhat - with a request to obtain essentiality certificate as the items to be procured are for use in petroleum operations. Indentor is also requested to check the PO and in case of any discrepancy, the same may be conveyed within 7 days. 2. Consignee: CM (MM)-I/C-Warehouse, ONGC, Central Stores, Cinnamara, Jorhat-785704 3. Paying Authority: Sr. F&A.O.- Bills, ONGC, Dhansiri Bhavan, Cinnamara, Jorhat-785704 4. Inspection Authority: I/c-QAD, ONGC, Mumbai. 5. Office copy. Despatch Instructions:Material/Goods should be dispatched duly securely packed to avoid breakages/pilferages/damages/shortages during transit. SECURITY DEPOSIT/PBGSupplier has submitted Security deposit in the form of PBG no. PEBBOM921043, Date: 03.02.2020 & amendment dated 17.02.2020 for Amount: Rs. 92,500.00 and Valid till: 30.05.2020. AREA OF OPERATION:PEL/ML/NELP SPECIAL INSTRUCTIONSGeneral Terms and conditions shall be as per Annexure - III attached herewith.
The Detailed Specification of the ItemsFor ITEM 1 0C7218000: MULTI GAS DETECTORMAT CODE: 0C7218000; Portable Multi Gas Detector; Make: Draeger, Model: X-am 2500.
|
|
Circular 27 2020consent of director but approval of L1 is required Quantity of items cannot be changed without approval of Committee of Director |
-