Tinkering Around!


 

This implies as bridge supply voltage decreases even minutely, the o/p voltage increases, almost doubles.

 

 

  1. WITH SENSOR CONNECTED BETWEEN 9B , 7B & 5B
  1. Before connecting sensor, adjust HV to about 2 V. connect sensor and adjust HV pot such that voltage between 9B & 7B is 2 V
  2. Connect meter between B/A 4(+) and B/A6(-) and adjust zero pot such that meter reads zero. If reading is negative, turn zero pot clockwise to increase
  3. The useful meter reading range is from 0 to 1 V
  4. 0 is 0% LEL and 1 V is 100% on which OR LED should light up. Adjust A1 , A2 to light up at 0.2 v and 0.6 v respectively.

 

 

 

  1. Expt2:

VHV =2 V between 9B & 7B

VA1=6.76 V (setpoint for A1 using A1 pot) (voltage at pin 2 of IC5B)

VA2= 6.90 V(setpoint for A2 using A2 pot) (voltage at pin6 of IC5B)

V5B= 1 V (measured) (signal voltage)

Voutput (IC3B pin 7 buffer voltage)= 6.13 V

 

OR setpoint= 7.12 V (pin9 of IC5D)(OR opamp)

Ref voltage for IC3C = 6.2 V (pin4 o/p of IC2)

 

 

13. Typical Repair case of AE-4103

In this card, on pressing READ button, FAULT will come, otherwise, PILOT glows without problem. When bench testing, it was also damaging the sensor, though, in control room rack, sensor was not damaged, but FAULT used to come on pressing read.

Solution

The NOR gate IC CD4001 was malfunctioning. The logic was all ok. However, current was leaking to adjacent gates. Therefore, when read button was pressed, 12 V should appear on the o/p pin of gate, instead 8 V was appearing and voltage at other pins were also changing due to internal current leak inside the IC and subsequent loading of the output (the o/p is designed to source only 6.8 ma of current max). This was varying the control voltage at the SMPS IC , hence high voltages were appearing on the output (instead of set 2 volts) and damaging the sensor. Replaced the IC, card works ok now.

 

 

Modified on by MANOJ CHERUKAT

find out if someone is on or off in 14 days on/off

MANOJ CHERUKAT Tags:  on/off days checker vba 14 excel 5 Comments 411 Views

Often it happens that people at home or office want to know whether a person would be on duty or off duty for planning a work or a function at  home etc. 

This software has been developed using Visual basic for applications (VBA) and runs in MS-Excel. Macros will have to be enabled for the file for this software to work.The software takes two inputs:-

(a) The date when the person has joined the shift ( to be entered in B1 cell)

(b) The date when his availability is to be ascertained. (to be entered in B4 cell)

 

After entering this data, click anywhere on the sheet, the result will be displayed in B7 cell and the full shift schedule starting from the date he has joined the shift to the test date period would be available in cell A10 onwards. Presently this will work for people in 14 days on/off shift.

click_here to download the file! Please note that macros have to be made enabled in order for this to work.

In-house design decode & repair of PCB-295 cards

MANOJ CHERUKAT Tags:  pcb-295 8031 microntroller display 2 Comments 337 Views

In-house design decode & repair of PCB-295 cards

1.    Introduction
This project is about repairing a card which is called the PCB 295. PCB 295 is used in the driller console for displaying various drilling parameters. The driller console is placed at the derrick floor of the rig. 

Drillers use an instrumentation system which is called the Advanced Instrumentation System or AIS. AIS has many sub-assemblies like the driller console  which is in the derrick  floor and the DAQ (Data Acquisition Unit) which is in the AIS  bunk house. 

The DAQ  is connected to the driller console by means of a serial link. The driller console has a series of horizontal and vertical LCD displays. Each of these horizontal and vertical displays require a display controller. This display controller is called PCB 295.

 
The values which are sent by the DAQ from the AIS bunk house are conveyed via redundant serial link by means of a stream which is a packet containing (address, data) pairs. All the parameters which are to be displayed are conveyed one by one serially. Each PCB 295 card has DIP switches which can set the address of the card.

Depending on the address received in the serial link , the card accepts the packet destined for it and drops the remaining. Once the packet is decoded, it is displayed in the respective horizontal or vertical display. Drilling parameters like hook load, bit weight, strokes per minute are displayed in the respective display(s). 

The hardware design of the card has been understood and so far 18 cards have been repaired. These cards had failed over a period of time.  The cost of each such card is about  Rs 66,615/- each. Therefore, the total cost of repaired cards is about  Rs Twelve Lakhs . Moreover, these cards are already out of production from OEM and these spares will be of help to meet contingency requirement till DAQ is upgraded to the next OEM supported version. 

2. Important part list:-

U1-CD 4011 BF (NAND gates) (CD 4011B)
U2-Intel 80c31BH (microcontroller)
U3-SN74HC373N (D Latch)
U4-AS65-6264 (RAM)- available RS INR 369 each
U5- ST M27C256 EEPROM
U6-CD4049 (Hex buffer/converter)
U7-HCF4047B (monostable multivibrator used as Watchdog timer)

VR1- LP2950 ACZ-5.0  voltage regulator 3 terminal

Q1 Q2 - 2N2907 NPN transistor

3. Tools required:-

1. Oscilloscope 20 MHz or Higher

2. Multimeter & LCR meter

3. 25 W soldering Iron

4. PTH Desoldering station 

5. Assorted Tweezers, snips, precision screw driver set. 

6. Mobile phone with 5X optical zoom

4. Key Learnings:-

1. Troubleshooting microcontroller based circuit cards.

2. How  watch dog timers are used to reboot microcontrollers in case of card errors

3. Desoldering of PTH ICs using vacuum desoldering station and to remove ICs from board without damaging PCB traces

4. How two serial signals are selected by microcontroller for maintaining redundancy. 

5. How trigger circuits are designed for making a re-triggerable monostable timer circuit. 
 

Download the Article to view the design, troubleshooting and repair exercise of these cards. 

Modified on by MANOJ CHERUKAT

Optical Fibre Cabling

MANOJ CHERUKAT 250 Views

1. For cabling involving trenching through GI, ensure before making estimates and BQ stage that the required dia pipe can be threaded for making connections etc. Local markets and plumbers generally have 1 inch die for threading 1 inch pipes.

2. GI Pipes come in classification of class A , B, C etc depending on quality. marked by  YELLOW, BLUE and RED  bands on the pipe in increasing order of pipe guage. Choose wisely.

3. Splicing Pigtails is easier and require less skill than fitting LC connectors onto optical fibre

 

 


    • 1
    • 2