Tinkering Around!


 

This implies as bridge supply voltage decreases even minutely, the o/p voltage increases, almost doubles.

 

 

  1. WITH SENSOR CONNECTED BETWEEN 9B , 7B & 5B
  1. Before connecting sensor, adjust HV to about 2 V. connect sensor and adjust HV pot such that voltage between 9B & 7B is 2 V
  2. Connect meter between B/A 4(+) and B/A6(-) and adjust zero pot such that meter reads zero. If reading is negative, turn zero pot clockwise to increase
  3. The useful meter reading range is from 0 to 1 V
  4. 0 is 0% LEL and 1 V is 100% on which OR LED should light up. Adjust A1 , A2 to light up at 0.2 v and 0.6 v respectively.

 

 

 

  1. Expt2:

VHV =2 V between 9B & 7B

VA1=6.76 V (setpoint for A1 using A1 pot) (voltage at pin 2 of IC5B)

VA2= 6.90 V(setpoint for A2 using A2 pot) (voltage at pin6 of IC5B)

V5B= 1 V (measured) (signal voltage)

Voutput (IC3B pin 7 buffer voltage)= 6.13 V

 

OR setpoint= 7.12 V (pin9 of IC5D)(OR opamp)

Ref voltage for IC3C = 6.2 V (pin4 o/p of IC2)

 

 

13. Typical Repair case of AE-4103

In this card, on pressing READ button, FAULT will come, otherwise, PILOT glows without problem. When bench testing, it was also damaging the sensor, though, in control room rack, sensor was not damaged, but FAULT used to come on pressing read.

Solution

The NOR gate IC CD4001 was malfunctioning. The logic was all ok. However, current was leaking to adjacent gates. Therefore, when read button was pressed, 12 V should appear on the o/p pin of gate, instead 8 V was appearing and voltage at other pins were also changing due to internal current leak inside the IC and subsequent loading of the output (the o/p is designed to source only 6.8 ma of current max). This was varying the control voltage at the SMPS IC , hence high voltages were appearing on the output (instead of set 2 volts) and damaging the sensor. Replaced the IC, card works ok now.

 

 

Modified on by MANOJ CHERUKAT

Understanding the Fisher 3582 positioner

MANOJ CHERUKAT Tags:  fisher instrumentation positioner 3582 243 Views

Fisher 3 that the travel pin remains perpendicular to connector arm during this process


2. tighten the cap nut and re-check the the arm at mid-travel position, if the zero degree marks don't align, repeat the procedure.

 

(b) For special travel pin setting (when travel pin setting greater than total actuator travel):-


The arm will not rotate 30 degrees in one direction as the valve is stroked and therefore the 30 degree marks will fall short of aligning with case index marks. only 

thing, the 'gap' between the index marks on the case and rotary shaft arm should be same in both directions (i.e., while stroking to 0 and 100%). If gap is not the 

same, adjust the pin position as described above to make it same.

 

3. WORKING


Working is as explained in the video and pg 32 in the datasheet. The valve positioner can be used in direct and reverse options. 


4. BEAM ALIGNMENT

 
The beam is leveled at the factory prior to shipment. Once the beam is leveled, no additional leveling should be required unless the
beam pivot pin or the bellows assembly pivot pin are changed, the bellows assembly or range spring (to increase the range from 3-15 psi to 6-30 psi) are replaced, or 

the valve positioner is changed to split range operation.


Names of important components to understand the Alignment:-
see fig-15 
Rotary shaft arm (), nozzle lock nut (), nozzle (), flapper assembly (), follower assembly locknut(),follower assembly (),bellows assembly locknut(),bellows pivot pin

(),beam pivot pin locknut(), beam pivot pin().

procedure for beam alignment given in pg 29 in datasheet.

 

5. CALIBRATION

procedure for calibration given in pg 31 in datasheet, the procedure in brief is given below:- see the actual pic:- positioner-photo

1. Keep the flapper assy at position 6 on the scale and stroke to 50 % of stem travel. if the stem does not match the 50% range, adjust the nozzle and tighten the 

nozzle lock nut.

2. When valve is stroked to zero and if the actuator does not move to the proper end of travel, loosen the nozzle lock nut and adjust the nozzle for zero.

3. When valve is stroked to 100% and if actuator does not move to proper end of travel, adjust the flapper assembly to higher value on the scale to reach 100% or if 

the actuator is already reaching 100% at a lower signal value (say 90% input),then adjust flapper assy to lower value on the scale.

4. If span is adjusted, then re-check for zero adjustment 

5. The positioner will fully vent or pressurize the actuator to supply pressure at the ends of actuator travel when the positioner is
calibrated correctly. Failure to properly calibrate the positioner may result in reduced seat loading


6. MAINTENANCE

6.1 Changing the range spring (pg 36 in datasheet) see FIG-21

The device can operate for supply pressure 3-15 psi and 6-30 psi. The higer range operation (6-30 psi) can be done by changing the range spring.(pg 36 in datasheet)

6.2 Adjusting the flapper pivot (pg 38 in datasheet) fig-20

If the flapper is touching the support or if need is felt to adjust the flapper, all you have to do is to loosen the two nuts (19C) which are marked by paint, push the 

ear (19K) slightly such that the flapper does not touch the support and tighten the two nuts (19C). For more details, follow instruction in page 38 in datasheet

6.3 Replacing the nozzle O ring (pg 38 in datasheet)

 

Modified on by MANOJ CHERUKAT

Well handing over during shift change using Excel Graphics

MANOJ CHERUKAT 368 Views

Well handing over during shift change using Excel Graphics

                   The changes made to a well like changing the bean size or bypassing the hi-lo valve or even closing the well are generally recorded in the shift register and verbally communicated to the taking-over shift. A small excel application can do this graphically thereby providing  color coded representation of the various activities carried out on the well.

 salient features:-

  1. Database driven, what ever changes are done to a well, are captured in a database which can be queried. MS access database is used as backend.
  2. The excel graphics are driven from the database, so that each time the excel file is opened, it automatically picks the latest changes from the database and same is displayed in the graphics.
  3. Single snapshot view of all the wells with a excel sheet dedicated to one area.
  4. As it is database driven, the database can be web-enabled so that the real time data can be seen at base-office/SAM's end.

Process:-

The person doing the updation does using a form like this:-

https://myspace.ongc.co.in/files/form/anonymous/api/library/720a78d9-3962-4d25-bc90-102c820740bc/document/c54f6af1-2868-41d4-9842-c21b98556291/version/189eb384-4564-45fe-9b99-48f9793ed65f/media/well_status_form.jpg

 

The excel file containing the graphics looks like this:-

https://myspace.ongc.co.in/files/form/anonymous/api/library/720a78d9-3962-4d25-bc90-102c820740bc/document/fcfe71de-601f-4f31-bddc-4f94d59c6102/version/c9493f9c-79e3-4b98-8e6e-5fc5b0e76db9/media/well_status_excel_scr.jpg

This is the legend page for the graphics:-

https://myspace.ongc.co.in/files/form/anonymous/api/library/720a78d9-3962-4d25-bc90-102c820740bc/document/e6e3cee1-68f5-4cc6-98b4-7ead3aa9691e/version/1a84e116-579e-4001-ae74-4291162f9907/media/excel_scr_legend.jpg

 

To try it out:-

  1. Download the access database here:-  https://myspace.ongc.co.in/files/form/anonymous/api/library/720a78d9-3962-4d25-bc90-102c820740bc/document/1cf91514-7a1a-4c74-a2d0-237b64fe30df/version/49f42619-67a2-4f73-bac4-75ccaccb725f/media/well_details.mdb
  2. Then, save it to a convenient location like say C:\test. Avoid locations like mydocuments or desktop.
  3. Open control panel, administrative tools, odbc data sources (32 bit), in system dsn tab, click add , select “driver do Microsoft access (*.mdb) “, click finish, takes you to next page called ODBC  Microsoft access setup.
  4. In Data source name , give well_proj. No other name.  Click on select and browse for your access .mdb file in the directory  you have copied say (c:\test). Click ok to accept.
  5. Now your DSN (data source name) is ready.
  6. Next, download the excel file from here:- https://myspace.ongc.co.in/files/form/anonymous/api/library/720a78d9-3962-4d25-bc90-102c820740bc/document/c35191f4-c356-4f8a-a668-7db9a69386ba/version/c757eeb9-1f33-4136-aeed-dc2c7f0a72ed/media/test_ado.xlsm
  7. Copy it to c:\test. Open the file and enable the macros if it asks you to. Now you can see the graphics. To change a well status, press ctrl +a to launch a form, click on any well, and change its status. Click ok
  8. Now click on another sheet, say LEGEND and click back to the sheet you were viewing, the changes you made to the form would have been updated to the graphics.

 

Learning:-

  1. Updating and manipulating Excel Graphics elements using data stored in Database. The graphic elements like shapes can be manipulated, their text changed, their background colors and orientation changed using code.

 

 

Modified on by MANOJ CHERUKAT

Working of Fuel Guage

MANOJ CHERUKAT Tags:  guage fuel 4 Comments 355 Views

A fuel guage has two units, the guage in the dashboard and the unit at the tank side as shown in figure. The tank unit is like a Rheostat whose one terminal is connected to ground and the other to the terminal marked T on the Guage. As float position moves downward (tank empty), the resistance becomes low and as float moves upward (full tank), the resistance becomes high. This arrangement  can also be reverse (empty tank-high Resistance, Full tank--> Low resistance).

The battery positive is connected to terminal B on the guage and the ground to  terminal marked ground. 12V and 6V guages exist. 

Two coils at 90 degree orientation are arranged (one between T & G in left to right  and other between T & B  in up -down direction). The pointer is attached to a magnet pivoted at the centre, which rotates as magnetic field generated by coils changes. One coil tries to move the magnet to Full position while the other tries to move the magnet to Empty position. When the magnet rotates,so does the pointer.

In old cars, the B connection is through the ignition key. So, turning the key to on, only shows the fuel level

Troubleshooting:-

Assuming the guage to be type where full tank indicates high resistance, following are trouble-shooting tips

1. Guage Always Reads full.

Disconnect the tank connection. Connect the T terminal to Ground, if the guage should move to empty, indicates good guage and disconnected wire to tank side or disconnected ground wire at tank side. If connecting T terminal to ground does not make the guage go empty, then guage is faulty.

2. Guage Always reads empty

Disconnected B or G terminal at Guage.

image

Document Management System

MANOJ CHERUKAT 229 Views

 A Document management system to catalog various types of reports. System allots a unique serial number based on type of report for easy cataloging of reports. 

Facility to search report based on multiple search parameters like type of report, year of generation, source of generation. Keyword search facility also available.

Sytem made with open-source technologies like PHP running on Apache Web-server and using open-source Post-gre SQL database and running on Debian-6 Linux OS.

Some screen-shots are given below:-image

image

 

 

 

 

 

 

 

 

 

  Seven Thousand Records Catalogued. The area where catalogued records are stored is shown below:-

 image image

 

 

 

 

 

 

 

 

 

An additional Module can scan CD/DVD and ingest all file names in a database. A unique serial number generated for CD/DVD for easy retrieval and identification. Search can identify a particular file stored in the soft-copy form in the CD/DVD.

 

Modified on by MANOJ CHERUKAT

Optical Fibre Cabling

MANOJ CHERUKAT 242 Views

1. For cabling involving trenching through GI, ensure before making estimates and BQ stage that the required dia pipe can be threaded for making connections etc. Local markets and plumbers generally have 1 inch die for threading 1 inch pipes.

2. GI Pipes come in classification of class A , B, C etc depending on quality. marked by  YELLOW, BLUE and RED  bands on the pipe in increasing order of pipe guage. Choose wisely.

3. Splicing Pigtails is easier and require less skill than fitting LC connectors onto optical fibre

 

 

SE/LVD/HVD SCSI and how to diffrentiate

MANOJ CHERUKAT 262 Views

Quick reference

SE-> Single Ended SCSI

HVD-> High Voltage Differential

LVD-> Low Voltage Differential

 

The voltage between the DIFFSENSE pin (#16) and Ground Pin (pin 50) can give an idea about the SCSI type from the SCSI peripheral under test. In a 68 pin SCSI Female connector, Pin # 16 is DIFFSENSE ( in HVD and LVD/MSE devices, whereas it is ground in SE devices)

For differentiating between  devices :-

measure voltage between pin #50 (GND) and pin # 16

If voltage > 2.4 volts, then it is HVD.

If  voltage < 0.5 V, it is SE

If 0.7 v < voltage < 1.9 v, it is LVD/MSE

 

The 50 pin Amphenol Male connector (centronics type) has pin #11 as Diffsense and Pin #16 as ground. (for M4 9 track drives round-reel)

Reading 9 track tape drive

MANOJ CHERUKAT 211 Views

Oh legacy! 

1. First set the block size to variable 

mt -f /dev/stx setblk 0

2. rewind the tape

mt -f /dev/stx rewind

 

3. copy the files using input block size =512 (still don't know how to find out the ibs? any idea?)

dd if=/dev/stx of=/myfate ibs=512 count=3 // imagining a file to be occupying 3 blocks of 512 bytes. write a loop to copy all files.

 

 

 

Tape Rewinds on Read

MANOJ CHERUKAT Tags:  tape san rscn 3592e05 2 Comments 233 Views

A 3592E05 drive using the dual ports  is connected as shown:-

image

The problem encountered was that each time a read job was fired to the tapedrive from the workstation, the tape used to rewind itself after copying a few files. Upon removing the connection to the SAN switch to the tape drive, the copy job completed without any problem.

Diagnosis : RSCN (Redundant State Change Notification) propogating in the SAN was rewinding the tape drive.The problem was due to addition of tape drive to the the SAN without 'zoning'. Zoning restricts such 'broadcast' events.

Solution: Opened the SAN switch through Cisco works, no zone found between the server and tape drive. Created a zone between the server and tape drive and reconnected the cables.   Fired the copy job and everything worked as it should work.

Lesson: Don't put orphaned tape drives on the SAN.

Resurrecting Old SGI workstations to run Linux

MANOJ CHERUKAT 2 Comments 268 Views

Reuse of SGI O2

1. Introduction

 

4.9 DATABASE BACKUP

 

PostgreSQL provides a utility called pg_dump to create a full backup of the database.

 

# pg_dump web filename.bkp

 

 

This command backs up the web database to filename.bkp. This is all that is required to regenerate the complete database and its table structure and the data.

 

 

5. SHIFT ALLOWANCE CALCULATION SYSTEM

 

To put the database deployed on SGI O2 to test, we developed a small application to calculate shift allowance of the shift personnel manning the 24X7 shift in the data centre.

The application was written in classic asp and used the database setup above using ODBC to connect to it.

 

 image

 

The shift personnel had to login to the system and mark the shift he was performing. (morning, evening or night)

 

image 

 

 

 

 

 

 

At the end of a shift schedule, a complete report can be obtained by three mouse clicks for the all the operations personnel which results in saving a lot of time and effort compared to manually making an excel sheet.

 

 

 

 

 

 

 

 

 

 

 

 

 

image 

 

Fig: Consolidated statement of shifts performed by personnel of CS(H/w)-GEOPIC

 

6. ICECAST STREAMING SERVER4

 

A streaming server is a server which streams music and audio content over a network. The setup below shows how streaming server works:-

 image

 

 

 

The ICES player, icecast2 and Apache webserver all run on a single O2. The client on the network can connect to the webserver on port 8000 using a web-browser. This opens the icecast interface and clicking on a playlist can listen to streaming music over the network

This plays in standard media players like vlc or winamp.

image 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig: ICECAST2 interface

  

7. Conclusion

 

It has been our endeavor to illustrate that old workstations can be reused for scaled down and custom applications. These applications run smoothly within the available limited computing resources. Besides, these workstations can be used very effectively for imparting training on linux and its applications to students.

Modified on by MANOJ CHERUKAT

    • 1