This is the photo of Riser at Location No. 19 which is at the edge of farmer's field but the farmer is insisting on removal of the riser from the location fearing damage to the crop in future if the water leaks from the same.
Riser No. 18-- It is about 12 meters from the edge of the farmers land. Farmer is insisting on removal of riser from his field. Riser can be shifted outside the field, utilizing the existing tapping on the pipeline by horizontally extending the riser pipe out of his field and then making it vertical. Prima facie GIL, OES and Asset are in agreement. GIL to put up a formal proposal for acceptance.
Valve installed on GRP pipeline at MPH, Ankleshwar. Hook up to be done with the old line as the weather becomes conducive.